First big project!
Posted: Tue Jul 12, 2011 12:36 am
So I am doing my first large project...and it turns out it is larger than I thought it would be! I thought I had 3, 18 count Aida (two for the Cleveland logos and one for my Starry Night w/ Tardis) but it turns out I have one 18 and two 14s.
So now I am doing a logo that is 10" W x 12.86 " H instead of 8 x 10 (and using WAY more thread since I need 3 strands for coverage).
So Panda just gave me a stand and scroll frame (cause she is awesome) but since I started at the top left, so it doesn't reach the top of the frame. Right now, I am just awkwardly trying to hold it and stitch. but it is taking forever!
Any tips on what to do before I can use the frame? It is driving me crazy!
Any other tips on the large projects??
So now I am doing a logo that is 10" W x 12.86 " H instead of 8 x 10 (and using WAY more thread since I need 3 strands for coverage).
So Panda just gave me a stand and scroll frame (cause she is awesome) but since I started at the top left, so it doesn't reach the top of the frame. Right now, I am just awkwardly trying to hold it and stitch. but it is taking forever!
Any tips on what to do before I can use the frame? It is driving me crazy!
Any other tips on the large projects??